Since the Makel’s have been able to move out their ’52 Grumman, Elvis has the floor where the Grumman used to be. Using some of Dave’s photos along with a few of mine, I’ll try to backtrack and bring the blog up to speed in one fell swoop. I'll try to go in sequence, but forgive me if something seems out of order.
The old beltline strips have been made like new again.
The last work on the drip caps, including the 10 foot piece for the streetside, is done. I never thought that . . .
. . . could look like this. Many thanks to Joey and Dave's TIG welding skills.
Elvis has been flipped, more than once. Belly-up at least once for the belly pan work among other things.
Not totally understanding everything, I can't explain the entire process.
But I recognize Cleco's and freshly-rolled banana wraps.
Some fine craftsmanship has been used to fabricate new corner wraps as well.
Here is an upside-down detail of the step area at the door. Dave says the step tracks in the outriggers are a prime place for clever mice and such to slip into a nice warm belly pan.
So he has fabricated what I call "critter caps" which will enclose the outriggers adjacent to the entry steps thus eliminating this rodent entry point.
Both sets of Ultrafab Power Twin stabilizing jacks have been placed and locations marked for final installation.
Access panels for the fresh and gray holding tanks have been designed and fitted.
The tank holding brackets with double-walled insulation are off to the side waiting for the final installation.
The dump valve disasters I've had with the Tradewind won't be an issue with Elvis. All but the knife valve opening will be above the belly, as it should be. Dave created a strong, fully-sleeved exit point in the streetside frame for the poop chute.
No contorted maze of ABS to "make things work" either (click here if you're wondering what I'm talking about). When the appropriate configuration isn't available, Dave makes it himself, a custom job that WILL work.
Flipped right-side up again to start on the subfloor.
First layer, a reflective sheet of insulation.
I can't remember the name or the manufacturer, but here is what the roll looks like.
Next, the plywood subfloor. If I remember correctly, wood biscuits were used in the process. Dave says many of the older Airstream plywood subfloors had trouble with glue failure and separation. His method is improved over the original for a solid piece that will hold over time.
With all the plywood down Elvis looks big enough to hold a barn dance. Now for more measuring, trimming, adjusting, etc.
A floor sandwich. I believe the top layer is a template. Dave indicated that the corner radius cut of Elvis is different compared to any others he has done, a different arc maybe? That comes back in to the lateral edges at either a shorter (or was it greater) distance? Unfortunately, our conversation about that was several months ago and I can't exactly remember the detail. Maybe this is characteristic of 13 panels, but Dave has restored 13 paneled 'Streams before.
Next, the cork underlayment made from cork composite. The corner radius does look different from my Tradewind. Would this explain why Elvis feels so roomy inside under the endcaps? I don't think he slopes in as much as others.
Now for the final layer of natural cork tile. I love it.
When I left the end of June, Dave and Joey were wrapping up the last of the tile. At some point, a few coats of protective sealer will be added. A sheet of something (forgot what) will be put over the floor for damage protection while the rest of the trailer is completed. I believe the next steps are stubbing out any drains or other utilities, loading the belly with the holding tanks, etc. So Elvis has the floor, in more ways than one. Before I left, I walked back into Elvis's shell. Most of the interior panels have been removed revealing the underside of his skin.
ALCLAD .032 * REYNOLDSThis is the stuff that Airstream dreams are made of.
Today a I received a wonderful update from Trailer Buff. Take a good look, YES! That is Elvis's shell on top of a well-protected floor and frame. Woo HOOO!!!! And this is Frank, Dave's recent hire, doing a fine job bucking rivets for some huge new sections of skin.
Elvis is getting new side skins from just forward of the wheel wells back to the rear endcaps. Joey is riveting a 12 foot section of Alclad to the streetside while Frank mans the bucking bar from the inside.
The finished streetside. This was done in part to remove the hinged sections above the wheels and restore the wheel wells to their original configuration.
This is the curbside when Elvis was first dismantled showing the old wheel well (hinged section removed) and the curbside trunk.
A positive transformation. A perfectly smooth job with superb riveting. Not an easy feat with pieces this long. These 12 foot panels are the largest skins Trailer Buff has ever had to replace on a restoration.
The front panel under the window needed new skin too. A plank of cardboard is protecting the skin from the spare tire holder during the process.
Rather, they were riveted only to the skins, in some cases only to one side, leaving a rather disjointed and shoddy framework. We can only speculate as to why, but Dave hasn't seen this on any other trailers, California or Ohio. I still marvel that Elvis traveled the yet unpaved Alaska highway with the Coffman's from beginning to end without some type of structural failure.
You probably can't tell in this blown-up detail, but sixty-two horizontal ribs have been replaced using angle brackets to secure them to the bows. Dave was really pleased how the work tightened up the entire framework making Elvis the sound and solid monocoque design he was meant to be.
Shell and frame has been moved together into the main bay, probably for the remainder of the work. The front panel looks great. You've gotta love a perfect line of fresh new rivets!
The long contiguous line of the curbside panel is much sleeker without the trunk. The tankless water heater will be located in the original trunk area, so reinstalling the trunk would be pointless and there really isn't any other location for one. Hey, it's one less place for leaks. Additional bracing for the awnings and solar panels will be next. Then on to the banana wraps.
Labor Day typically signifies the end of all things summer so what better time to go through the summer's photos. Especially since the south is in a record-breaking deluge today thanks to tropical storm Lee, no outdoor activities here. If I were a 4th grader, this would be my "What I did this summer" assignment.
It only takes a few to make a rally.
And any good rally has kids.
The continuous cloud cover obscuring the Blue Ridge was nearly the most stressful part of the weekend. A little misty fog in one's life isn't all that bad in the whole scheme of things.
I had a couple of occasions to visit my good friends at Coker Tire this summer. This little 1957 Isetta in the service lobby gave me opportunity to see just how cramped Pee Wee Schwamborn's 6 foot plus frame must have been driving one of these from New York to Los Angeles for Wally Byam. 
Rick and I (mostly Rick) gave the Tradewind a long overdue polish to prep for the Route 11 Caravan. God love him, even the roof. Only the very best of friends would say, "Next time we polish the Airstream . . . " He is every bit of that.The Historic Route 11 Caravan was the Airstream highlight of my summer. The brain child of Paul Waddell along with Hunt Jones and myself in supporting roles, it came off elegantly. Seven days, from Bristol, TN to Alexandria Bay, NY in the 1000 Islands on the St. Lawrence. Six Airstreams from start to finish along with several more joining at points in between.Our group was low key, no agenda, no kitty fee, no hardcore plans, just show up at the designated campground by 8PM or we'll send out a search party. Everyone paid their own way for whatever they wanted to do and everyone got to do exactly what they wanted. If you have never caravanned like this before, you should at the first opportunity. I WILL be doing this again.
After the caravan I spent some time in my favorite driveway and Lulu spent some one-on-one with her favorite young lady playing in the Shenandoah River. A stop by the cabin and Trailer Buff on the way home was a perfect ending to nearly three great weeks.
Mom celebrated her 83rd in July. I'm glad I still have my Mom. I hope she's around for many more.
This is how I thought the back end of my truck would look tomorrow. Except to Texas to retrieve Elvis, my truck has never gone more than a hundred miles or so without an Airstream attached. I would have felt almost naked.
A week anticipated for great fun in Virginia has spiraled into a cluster of stupidity. I won't go into every detail, but the kingpin event was the leaking water heater in the Tradewind. It can't be good when you see oddly placed fans blowing at top speed in an Airstream. This was bound to happen, I just didn't know when.